41
Acres
2
New Buildings
BB5
Location
Challenge
Dogs4Rescue secured a fantastic location on the outskirts of Accrington, Cheshire, to develop an old farm into a new dog sanctuary for unwanted dogs.
Whilst the land and location were perfect, it was some distance off the main road with access via an old farm track. There were no existing utilities and beneath the surface were historical mine workings.
Prior to any construction works being able to commence, the above elements needed addressing together with discharging planning conditions and commercial management.
As a non-profit organisation, there was a huge emphasis to achieve the completion date as soon as practically possible and to keep within budget.
Solution
Dogs4Rescue already had a fantastic team of architects and advisors who had overseen the early stages of the planning and development. We were introduced to project manage and organise the scheme, address planning matters, programme the works and procure key delivery suppliers.
Accessing the site was a challenge. Knowing that we needed to accept large construction equipment and deliveries, the access track was improved and widened enough to safely accept the expected traffic.
Whilst the buildings had already been procured as timber frame solutions there were unknown factors such as the ground conditions, foundations, and drainage design.
To maximise the efficientcy of the programme, we commenced from the ground up, commencing with the procuremnt and delivery of the site investigation. This enabled the development of the remediation strategy associated with hydrocarbon contamination, drainage and foundation designs. It was then possible to complete the initial grouting works to the former mine workings.
Concurrent with the these operations, the structural and final designs were being agreed and submitted for planning approval which were all agreed and in place ready to install the main building.
The groundworks were also able to follow the grouting works meaning minimal downtime between phases, allowing the timely installation of the new timber frame building.
Due to the lack of available services nearby and previously high quotes for new electricity and water connections, it was the intention to use a generator and borehole to feed the site. We reviewed these proposals and looked at alternative solutions. We successfully negotiated an affordable mains electricity and water supply.
Throughout the project, the budget was constantly under review and a saving was made by the late redesign of one of the buildings. A pre-fabricated option was installed instead of an in-situ frame which freed up funds for other vital elements of the development.
Project gallery
At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.
Project
Dogs4Rescue Facility
Project Management for Phase 1 works at Rescue World, a sanctuary and rehabilitation retreat for the dogs.
Project
Winterfold School Car Park
Alteration works to an existing school car park. The modifications were aimed at improving safety, access and general performance.
Project
Herbert’s Yard, Longbridge
The construction of a timber framed building and associated hard and soft landscaped areas to create a community focused mixed social space and street food venue.
Project
Firefighting Water Storage
Maintain 45,000 litres of readily available water for firefighting purposes at a school in a rural setting.