Project

Firefighting Water Storage, Winterfold

45000

Litres of Water Storage

1

Bespoke Tank Designed

DY10

Location

Challenge

Our client has a requirement to maintain 45,000 litres of readily available water for firefighting purposes at a school in a rural setting.

Solution

This was achieved using their outdoor swimming pool. Over the years, the pool had fallen out of use and had become dilapidated and a health and safety risk. Whilst the school’s need for a swimming pool had gone, its obligations under fire safety legislation had not. The school wished for an outside contemplation zone in the area of the former pool and originally planned for decking over the redundant pool.

As this posed further health and safety risks over time, the ideal solution was to install a tank and backfill to enable hard landscaping to be installed over the top. We proposed the use of a storm water storage tank filled using rainwater harvested from an adjacent building. A depth gauge was installed to easily demonstrate that the tank was adequately filled at all times.

At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.

Project

Club Shop, BCFC

The renovation of the club shop to meet the requirements of Nike retail standards. This included strip out, forming new shop frontage facilitated by major alterations to the existing steel frame, new internal walls, M&E, HVAC, shopfitting, flooring and decoration.

Project

Pavilion Building, Wantage

The client required a sports pavilion to utilise a plot at the centre of a large new build housing development in Wantage, near Oxford.

Project

Phases 4E, 4G and Eastern Lakes

This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.