Phases 4E, 4G and Eastern Lakes, Llanwern 

285500

m³ earthworks completed

11000

m³ of below ground structures processed

NP19

Location

Challenge

This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.

The ground conditions across the site were extremely challenging, with compressible clays and peat, legacy foundations, contamination and the widespread presence of slag. Our earthworks experts added value at every stage of this major regeneration programme.

Solution

Using our previous experience and expertise, we utilised a fleet of earthworks resource to carefully manage the earthworks process. In order to achieve the challenging programme we sitewide dewatering to enable multiple work fronts to be tackled simultaneously.

We assisted the Client’s engineer validate the work to achieve sign off from the appropriate regulators.

At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.

Project

Club Shop, BCFC

The renovation of the club shop to meet the requirements of Nike retail standards. This included strip out, forming new shop frontage facilitated by major alterations to the existing steel frame, new internal walls, M&E, HVAC, shopfitting, flooring and decoration.

Project

Pavilion Building, Wantage

The client required a sports pavilion to utilise a plot at the centre of a large new build housing development in Wantage, near Oxford.

Project

Phases 4E, 4G and Eastern Lakes

This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.

Project

Local Centre Buildings, Wantage

Design adn construction of 3 commercial retail units to shell only stage, to achieve BREEAM Very Good standard