13500
ft² internal floor area
7
electric vehicle chargers installed
OX12
Location
Challenge
The client required a community focused local centre to utilise a plot at the heart of the new Kingsgrove development in Wantage, near Oxford. Owned by the CO-OP, the local centre is mixed-use development offering a large convenience store, 3 retail units and a children’s nursery. To deliver the client’s vision, the project demanded a high quality finish with a focus on detail. The design included a challenging development containing part-steel frame, extensive brick and blockwork, large detailed timber trussed roofs and rendered ‘flying gables’. The project included: –
- Earthworks
- Groundworks
- Drainage and services
- Building works
- Mechanical and electrical systems
- Hard and soft landscaping
All of the elements of the project were to be delivered in a busy environment, directly next to a school, therefore it was imperative to minimise disruption and be respectful of the local community.
Solution
Assembling a team of trusted people and suppliers, we commenced the project with a clear plan and programme designed to achieve the occupation date of the end user.
Due to the detailed build a key component of this was the detailed coordination required between not only us and our delivery team, but also the client and their consultants, the new services providers (BT, electricity and water), Building Control, the Clinet’s management team and the end user and their fit-out contractors.
The project was completed, signed off and handed over on programme and within budget. The Local Centre opened in March 2025 and has been a huge success locally and in the wider area.
Project gallery
At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.
Project
Retail Unit, Thornton Cleveleys
The Client required a retail unit to utilise a plot at the entrance to a new housing development in Thronton Cleveleys, near Blackpool.
Project
Phases 4E, 4G and Eastern Lakes
This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.
Project
Local Centre Buildings, Wantage
Design adn construction of 3 commercial retail units to shell only stage, to achieve BREEAM Very Good standard
Project
Wantage Eastern Link Road
Design and construction of a new Section 278 link road with associated connections to the existing highway.