Challenge
The Client required a retail unit to utilise a plot at the entrance to a new housing development in Thronton Cleveleys, near Blackpool. Owned by the CO-OP, the retail unit provides local convenience retail services to the new overall development. To deliver the Client’s vision, the project demands a high quality finish that is both welcoming to commuters and passers-by, as well as an easily accessible retail unit for the new community. The project included: –
- Earthworks
- Groundworks
- Drainage and services
- Building works
- Mechanical and electrical systems
- Hard and soft landscaping
All the elements of the project were to be delivered in a busy environment, directly next to a school and new build housing development, therefore it was imperative to minimise disruption and be respectful of the local community.
Solution
Assembling a team of trusted people and suppliers, we commenced the project with a clear plan and programme designed to achieve the occupation date of the end user. Due to tight programme and the close proximity of a the new build housing development, every small component was coordinated between not only us and our delivery team, but also the client and their consultants, the neighbouring developer, the new services providers (BT, electricity and water), Building Control, the Client’s management team and the end user and their fit-out contractors. The project was completed, signed off and handed over on programme and within budget. The retail unit opened in April 2025 and has been a huge success locally and in the wider area.
Project gallery
At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.
Project
Retail Unit, Thornton Cleveleys
The Client required a retail unit to utilise a plot at the entrance to a new housing development in Thronton Cleveleys, near Blackpool.
Project
Phases 4E, 4G and Eastern Lakes
This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.
Project
Local Centre Buildings, Wantage
Design adn construction of 3 commercial retail units to shell only stage, to achieve BREEAM Very Good standard
Project
Wantage Eastern Link Road
Design and construction of a new Section 278 link road with associated connections to the existing highway.