Project

Yaxley Synchronous Condenser

17216

m³ of Material Moved

4

Landscape and Screening Bunds

IP23

Location

Challenge

The Client required a quick delivery of a suitably engineered platform to facilitate the construction of the new grid infrastructure.

The site was covered in dense vegetation and works due to take place during bird nesting season. The existing site soils were susceptible to wet weather so needed to be managed carefully to avoid replacement, additional, imported material. The project included: –

  • Site clearance
  • Topsoil management
  • Surface water drainage attenuation
  • Platform construction
  • Working platform
  • Soft landscaping
  • Testing and validation

Solution

Prior to commencing the work on site, bird nesting mitigation measures were put in place and a watching brief provided by an ecologist during the vegetation clearance.

The site was divided into grid squares to manage the material movements and reengineering efficiently. A full testing strategy was implemented and verified prior to the platform construction. The earthworks and drainage were prioritised and upon handover of the platform the external landscaping and associated works then continued. This allowed the foundations to commence prior to full completion of the enabling works.

At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.

Project

Retail Unit, Thornton Cleveleys

The Client required a retail unit to utilise a plot at the entrance to a new housing development in Thronton Cleveleys, near Blackpool.

Project

Phases 4E, 4G and Eastern Lakes

This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.

Project

Local Centre Buildings, Wantage

Design adn construction of 3 commercial retail units to shell only stage, to achieve BREEAM Very Good standard

Project

Amphitheatre, BCFC

Design and Construct sections 1 & 2 of the Wantage Eastern Link Road including connections to existing highways.