Project

Cellarhead Substation

22000

m³ of Material Moved

3000

m³ of Rock Processed

ST9

Location

Challenge

The extension to the Northern end of the existing substation was to be cut in to an existing bank with restricted access and egress.

If the material was to be moved through the live substation it would have impacted operations and added months to the operation. The project included: –

  • Temporary access
  • Footpath diversion
  • Site clearance
  • Earthworks
  • Material processing
  • Temporary works
  • Validation

There was also rock at relatively shallow depths.

Solution

Negotiation with adjacent landowners and temporary protection measures were introduced to allow us to remove the surplus material without the need to traffic through the live site.

Due to the nature of the road and weight restrictions, we utilised agricultural tractors and trailers to remove the materials opposed to articulated dumptrucks.

We were able to process enough of the rock to provide the backfill material for the new retaining walls which saved on both import and export of materials.

At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.

Project

Retail Unit, Thornton Cleveleys

The Client required a retail unit to utilise a plot at the entrance to a new housing development in Thronton Cleveleys, near Blackpool.

Project

Phases 4E, 4G and Eastern Lakes

This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.

Project

Local Centre Buildings, Wantage

Design adn construction of 3 commercial retail units to shell only stage, to achieve BREEAM Very Good standard

Project

Amphitheatre, BCFC

Design and Construct sections 1 & 2 of the Wantage Eastern Link Road including connections to existing highways.