Project

Phases 4E, 4G and Eastern Lakes, Llanwern 

285500

m³ earthworks completed

11000

m³ of below ground structures processed

NP19

Location

Challenge

This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.

The ground conditions across the site were extremely challenging, with compressible clays and peat, legacy foundations, contamination and the widespread presence of slag. Our earthworks experts added value at every stage of this major regeneration programme.

Solution

Using our previous experience and expertise, we utilised a fleet of earthworks resource to carefully manage the earthworks process. In order to achieve the challenging programme we sitewide dewatering to enable multiple work fronts to be tackled simultaneously.

We assisted the Client’s engineer validate the work to achieve sign off from the appropriate regulators.

At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.

Project

Retail Unit, Thornton Cleveleys

The Client required a retail unit to utilise a plot at the entrance to a new housing development in Thronton Cleveleys, near Blackpool.

Project

Phases 4E, 4G and Eastern Lakes

This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.

Project

Local Centre Buildings, Wantage

Design adn construction of 3 commercial retail units to shell only stage, to achieve BREEAM Very Good standard

Project

Wantage Eastern Link Road

Design and construction of a new Section 278 link road with associated connections to the existing highway.