Challenge

Our client has a requirement to maintain 45,000 litres of readily available water for firefighting purposes at a school in a rural setting.

Solution

This was achieved using their outdoor swimming pool. Over the years, the pool had fallen out of use and had become dilapidated and a health and safety risk. Whilst the school’s need for a swimming pool had gone, its obligations under fire safety legislation had not. The school wished for an outside contemplation zone in the area of the former pool and originally planned for decking over the redundant pool.

As this posed further health and safety risks over time, the ideal solution was to install a tank and backfill to enable hard landscaping to be installed over the top. We proposed the use of a storm water storage tank filled using rainwater harvested from an adjacent building. A depth gauge was installed to easily demonstrate that the tank was adequately filled at all times.

At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.

Project

Dogs4Rescue Facility

Project Management for Phase 1 works at Rescue World, a sanctuary and rehabilitation retreat for the dogs.

Project

Winterfold School Car Park

Alteration works to an existing school car park. The modifications were aimed at improving safety, access and general performance.

Project

Herbert’s Yard, Longbridge

The construction of a timber framed building and associated hard and soft landscaped areas to create a community focused mixed social space and street food venue.

Project

Firefighting Water Storage

Maintain 45,000 litres of readily available water for firefighting purposes at a school in a rural setting.