17216
m³ of Material Moved
4
Landscape and Screening Bunds
IP23
Location
Challenge
The Client required a quick delivery of a suitably engineered platform to facilitate the construction of the new grid infrastructure.
The site was covered in dense vegetation and works due to take place during bird nesting season. The existing site soils were susceptible to wet weather so needed to be managed carefully to avoid replacement, additional, imported material. The project included: –
- Site clearance
- Topsoil management
- Surface water drainage attenuation
- Platform construction
- Working platform
- Soft landscaping
- Testing and validation
Solution
Prior to commencing the work on site, bird nesting mitigation measures were put in place and a watching brief provided by an ecologist during the vegetation clearance.
The site was divided into grid squares to manage the material movements and reengineering efficiently. A full testing strategy was implemented and verified prior to the platform construction. The earthworks and drainage were prioritised and upon handover of the platform the external landscaping and associated works then continued. This allowed the foundations to commence prior to full completion of the enabling works.
Project gallery
At ACS Midlands we have many capabilities. Get in touch for more information on this project or to discuss your requirements.
Project
Carrington BESS
Project
Club Shop, BCFC
The renovation of the club shop to meet the requirements of Nike retail standards. This included strip out, forming new shop frontage facilitated by major alterations to the existing steel frame, new internal walls, M&E, HVAC, shopfitting, flooring and decoration.
Project
Pavilion Building, Wantage
The client required a sports pavilion to utilise a plot at the centre of a large new build housing development in Wantage, near Oxford.
Project
Phases 4E, 4G and Eastern Lakes
This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.