NEWS
Dogs4Rescue Phase 2, Accrington
The construction of 2 no. timber frame buildings and associated retaining walls, including hard and soft landscaped areas to create a new living and working space for Dogs4Rescue charity organisation.
NEWS
Dogs4Rescue Phase 2, Accrington
Read More
NEWS
AIW 6&7, Wantage
The construction of 740m of road and all associated drainage, utilities, and soft landscaping to further extend a new housing development.
NEWS
AIW 6&7, Wantage
Read More
NEWS
Fan Park, BCFC
The construction of a covered fan park to include food, beverage and retail outlets. 2 separate roof structures were required together with complex combined foundations for the prefabricated units and roof supports.
NEWS
Fan Park, BCFC
Read More
NEWS
Club Shop, BCFC
The renovation of the club shop to meet the requirements of Nike retail standards. This included strip out, forming new shop frontage facilitated by major alterations to the existing steel frame, new internal walls, M&E, HVAC, shopfitting, flooring and decoration.
NEWS
Club Shop, BCFC
Read More
NEWS
Pavilion Building, Wantage
The client required a sports pavilion to utilise a plot at the centre of a large new build housing development in Wantage, near Oxford.
NEWS
Pavilion Building, Wantage
Read More
NEWS
Cellarhead Substation
The extension to the Northern end of the existing substation was to be cut in to an existing bank with restricted access and egress.
NEWS
Cellarhead Substation
Read More
NEWS
Yaxley Synchronous Condenser
The Client required a quick delivery of a suitably engineered platform to facilitate the construction of the new grid infrastructure.
NEWS
Yaxley Synchronous Condenser
Read More
NEWS
Retail Unit, Thornton Cleveleys
The Client required a retail unit to utilise a plot at the entrance to a new housing development in Thronton Cleveleys, near Blackpool.
NEWS
Retail Unit, Thornton Cleveleys
Read More
NEWS
Phases 4E, 4G and Eastern Lakes
This 600-acre former steelworks was being transformed into a mixed-use development with housing. We were asked to provide earthworks solutions across a complex site with challenging ground conditions.
NEWS
Phases 4E, 4G and Eastern Lakes
Read More
NEWS
Local Centre Buildings, Wantage
Design adn construction of 3 commercial retail units to shell only stage, to achieve BREEAM Very Good standard
NEWS
Local Centre Buildings, Wantage
Read More
NEWS
Amphitheatre, BCFC
Design and Construct sections 1 & 2 of the Wantage Eastern Link Road including connections to existing highways.
NEWS
Amphitheatre, BCFC
Read More
NEWS
Firefighting Water Storage
Maintain 45,000 litres of readily available water for firefighting purposes at a school in a rural setting.
NEWS
Firefighting Water Storage
Read More
NEWS
Dogs4Rescue Facility
Project Management for Phase 1 works at Rescue World, a sanctuary and rehabilitation retreat for the dogs.
NEWS
Dogs4Rescue Facility
Read More
NEWS
Service Separation Works, Longbridge
Separate the external services to a shared car park from the individual building to create new landlord’s supplies and independent networks and systems.
NEWS
Service Separation Works, Longbridge
Read More
NEWS
Winterfold School Car Park
Alteration works to an existing school car park. The modifications were aimed at improving safety, access and general performance.
NEWS
Winterfold School Car Park
Read More